REPRESENTATIVE INDUSTRIAL PROJECT EXPERIENCE

 

Guadalupe Warehouse – Boundary and topographic survey, grading, drainage, and paving plans, plat, sewer lift station analysis, design and construction documents, public sewer plans, legal description, and Priest Drive paving plans for a new two-building office warehouse facility totaling 107,587-sf on 3 lots totaling approximately 6.71 acres.  Guadalupe, Arizona.

 

Baseline Commerce Center – ALTA survey, preliminary plat, preliminary grading and drainage plans, revise plat and grading and drainage plans, subdivision technical review plans, grading, paving, and utilities, stormwater management plans, final plat, legal descriptions for cross easements, grading, drainage, and utility plans, and legal descriptions for Lots 1, 2, and 3 for new multiple-pad commercial subdivision on 5.72 net acres.  Mesa, Arizona.

 

Durel / Phospher Building Expansion – Topographic survey and grading, paving, and utilities plans for initial 68,000-sf building expansion and parking lot addition on 6-acre existing site, and an additional 8,000-sf building addition in the second phase.  Chandler, Arizona.

 

Desert Cove Industrial – Survey, preliminary engineering plans, grading, paving, and utilities plans for new 67,500-sf office warehouse building on 4 acres.  Phoenix, Arizona. 

 

Coulter Properties – Topographic survey, preliminary engineering, and grading, paving, and utilities plans for new 50,300-sf office warehouse facility on 4 acres.  Phoenix, Arizona. 

 

Bashas' Distribution Center – Field boundary survey, subdivision plat, topographic survey, and grading and drainage plans for approximately 3.5 acres of a 5-acre undeveloped site.  Chandler, Arizona. 

 

Chariot Eagle – Topographic survey, concept engineering plan, grading, drainage, and paving plans, onsite utility plans, stormwater management plan, offsite paving plans, striping plan, and as-built survey for a new manufacturing facility on approximately 8 acres of land.  Tolleson, Arizona.

 

TRW Safety System, Inc. Site II – Surveying, grading, drainage, utility plans for new inflator building on ten acres, central warehouse and administration maintenance operation building on eight acres, finished goods warehouse on five acres, and two explosive storage magazines.  Mesa, Arizona.